Quillity & Countrol
  • QC/Technical Support
    QC is completely performed in house. Before our QC staff start this job, they have to get a professional training and go through a series of technical examinations.
  • QC Staff
    20 to 29
  • Standards & Approvals
    ISO 9001
    TUV/GS
    CE
    EMC
    LCIE
  • UL
  • ANSI
    DIN

Spool machine spooling in wire rope with adjustable load


Testing machine ensuring winch quality control more reliable

  • Materials/Components
    Motors, stators, rotors, gears, planetary gear systems, steel, cast aluminum, press parts, plastic parts, steel wire ropes, electric codes
  • Procedures/testing Details
    Follow ISO9001,All materials and components are first inspected by our QC team before being put into production. During every step of production, there are certain staff to completely supervise for key steps. The finished products are checked before and after packaging by QC staff or customers.
  • Other Information
    We own a professional line pull testing machine, which is designed and made by ourselves and the maximum testing pounds can reach 16,000 pounds.